Saturday, July 16, 2016

Lake Bank work on Bear #11 and #12

Please see the before and after photos below from the lake bank work that was recently completed along the 11th and 12th holes of the Bear golf course.  We used the geotube method to create a gradual slope down to the water's edge.  This is a long term repair that will create a safer, more aesthetically pleasing and more playable area.

BEFORE:
 

 
 
DURING, GEOTUBES PRIOR TO GRADING:



DURING, GEOTUBES AFTER GRADING:

 
 
 
 
AFTER, FINISHED PROJECT:

No comments:

Post a Comment