Friday, June 5, 2015

Sod going down and lake interconnect install

The Bobcat project includes the installation of 6 lake interconnect pipes.  Below is a photo of work in progress replacing the compromised pipe between the 2 lakes on #5 (tee and green).  The old metal pipe is removed, a gravel bedding placed in the trench and new HDPE pipe installed in its place.

 
 
Excitement was brimming as sod began to go down on Monday morning.  #7 green surround was the first one to receive sod.  We will be sodding loops around greens and bunkers, as well as all slopes, an sprigging all areas in between.
 



 

 

No comments:

Post a Comment