The Bobcat project includes the installation of 6 lake interconnect pipes. Below is a photo of work in progress replacing the compromised pipe between the 2 lakes on #5 (tee and green). The old metal pipe is removed, a gravel bedding placed in the trench and new HDPE pipe installed in its place.
Excitement was brimming as sod began to go down on Monday morning. #7 green surround was the first one to receive sod. We will be sodding loops around greens and bunkers, as well as all slopes, an sprigging all areas in between.