Over the past 2 weeks our irrigation contractor for the Bobcat Project, Mike Roach Irrigation (MRI), has begun installing main line piping.  All 4 directional bores are now complete and MRI has begun trenching in the utility easement behind #10 tee/#13 green (below).  When construction officially begins on April 6, 2015 we will have over 2500' of main line already installed.


A great feature of MRI's team is that each individual is factory trained and certified in High Density Polyethylene (HDPE) fusion welding.  For an additional level of accountability, company protocol is to record the time, date and the name of the fusion operator at each weld, recorded physically on the pipe (below).