Thursday, June 5, 2014

Completed drainage project

Last week we put the finishing touches on our large drainage project between #10/#16 fairways.  You will recall the large ditch reachable from both holes on a tee shot, that connected two large 30" culverts.  We installed pipe and filled the ditch, then sodded the area.  Notice the before/after photos below. 


No comments:

Post a Comment